Repository logo
Communities & Collections
All of DSpace
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
Log In
New user? Click here to register.Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Mangal, Adarsh"

Filter results by typing the first few letters
Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • No Thumbnail Available
    Item
    Study on non-linear planning model of green building energy consumption under multi-objective optimization
    (Springer, 2021-11-09T00:00:00) Fan, Miao; Su, Danna; Bhatt, Mohammed Wasim; Mangal, Adarsh
    The research on economic balance and balanced competition is the initial concept that has reflected the idea of multi-objective programming which is usually encountered in the modeling of green buildings. This concept has laid the base in building a multi-objective optimization problem, for the establishment of model and calculation. By establishing a nonlinear planning model for determining the control target value of the project and by calculating the results, it is assumed that the sample is estimated as a very large likelihood, with consistency and non-biasing. In this paper several variables are analyzed and focus has been paid to weather conditions by making several interpretations: If the weather is good, the pit = 1, the engine can successfully complete the project amount of the plan; if constructed, when the weather is not conducive to engineering construction, then pit < 1 indicates that the increasing amount caused by the imbalance is used. Thus, the imbalance of resources has increased the entire project cost; the usage of closer approach to investment reflects less payment, small use of funds, therefore lower will be the cost. By establishing a model to determine the control target value of the project, the total amount of actual investment is 153.439 million Yuan, after the results calculation is optimized and the total cost after the initial progress plan is 5.34 million Yuan, combined with the project. Using NLP cost optimization is obtained with the overall construction efficiency. � 2021, The Society for Reliability Engineering, Quality and Operations Management (SREQOM), India and The Division of Operation and Maintenance, Lulea University of Technology, Sweden.

DSpace software copyright © 2002-2025 LYRASIS

  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify